to raise the existing site level. Installation of a Synthetic all weather training pitch. Erection of 3 no. 10m High Floodlighting colums. 2.4m high fence with gates accessing the pitch. 3.6m high ball stop netting above the level of the pitch fencing. Relocating of existing localised foul and storm line and Installation of underground drainage
Reference: 23272
| Received: | 10 May 23 |
| Decision: | N/A |
You must be signed in to comment on planning applications
Be the first to provide a comment on this planning application
Sign in to interact with comments or add your own.