Temporary permission sought for a period of five years at Malahide Portmarnock Educate Together Secondary School. The development will consist of the provision of 3 no. ballcourts; a pedestrian and cycle access route running from a new gated access at the north-west corner of the existing school grounds to the existing gate at the southern boundary of the adjoining public open space (adjoining the Waterside development) with associated boundary fencing and public lighting; surface water drainage (including attenuation tank, filter drains, surface water sewer, manhole and headway); and all associated site development works above and below ground.
Reference: F23A/0415
| Received: | 11 July 23 |
| Decision: | 4 September 23 |
You must be signed in to comment on planning applications
Be the first to provide a comment on this planning application
Sign in to interact with comments or add your own.