new ancillary structures relating to the operating of the existing biogas facility as follows: 1. Biofilter & Air Scrubber (including exhaust stack affixed to existing reception building at max. height of 14m above ground level). 2. LPG Tanks Compound. 3. Enclosed Flare. 4. Provision of 3 No. Storage Digestors with gas storage domes (max. height c.13m). 5. Biogas Upgrader (including Absorption Column 15.257m and a Stripper Column 12.8m). 6. Compressor. 7. Additional standby CHP 2 Enclosure. 8. LPG Boilers. 9. Carbon Filters. 10. Abstraction Sump. 11. Switch Room. 12. Vertical biofilter. 13. Co2 liquefaction plant (max. height 11.3m). 14. New bund wall around the perimeter of the site (max. 0.5m above ground level. 15. Attenuation Tank and all associated site works including decommissioning of existing lagoons and new surface water arrangements. Revised by Significant Further Information
Reference: 23894
| Received: | 12 September 23 |
| Decision: | 15 February 24 |
| ABP Decision: | 18 November 24 |
You must be signed in to comment on planning applications
Be the first to provide a comment on this planning application
Sign in to interact with comments or add your own.