10-year permission. The development will consist of (1) Integrated Constructed Wetland (ICW) type Wastewater Treatment Plant (WWTP) for the treatment of wastewater from the Grangemockler agglomeration comprising of 1 No. septic tank and 4No. ICW ponds; (2) Provision of a new terminal wastewater pumping station and stormwater management at the site of the existing Slievardagh Estate Developer Provided Infrastructure (DPI) WWTP, which is to be decommissioned; (3) Access road surrounding the ICW ponds; (4) decommissioning of 2 existing septic tanks (Mill River and Lingaun Park); (5) Ancillary works associated with the development including the associated pipework, fencing and landscaping; (6) pedestrian access via new footbridge over the Currasilla Stream; (7) upgrade existing culvert bridge under existing access road; (8) the installation of a ground mounted solar photovoltaic (PV) array. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with this application.
Reference: 2560566
| Received: | 17 June 25 |
| Decision: | 7 August 25 |
| ABP Decision: | 11 February 26 |
You must be signed in to comment on planning applications
Be the first to provide a comment on this planning application
Sign in to interact with comments or add your own.