develop the following infrastructure: • Demolition of an existing section of boundary wall (6.5m length) at the existing wastewater pumping station (Ballacollig WWPS) site • Removal of existing kerb and verge at access gate location • Relocation of existing lamp post • New 6.5m long, 2.4m high double leafed palisade access gate • New access ramp within existing wastewater pumping station (Ballacollig WWPS) site to allow vehicle access
Reference: 2660276
| Received: | 14 May 26 |
| Decision: | N/A |
You must be signed in to comment on planning applications
Be the first to provide a comment on this planning application
Sign in to interact with comments or add your own.