EXPP: Installation of a wireless broadband equipment connection. This work entails installing steelwork and dish on rooftop at agreed location and cable will be ran from this dish down to comms room in the building. Cable route and dish position will have been agreed at survey stage. IDU is mounted internally in the customers rack. All telecoms equipment is 48volts Dc. 2 antennas are required. 1 Nuritas and 1 sub let tenant GH Research for the 2nd floor. Antennas will be installed at the side of the boiler house plant room on the roof, they are minimal in size as per the spec sheets provided.
Reference: 0167/26
| Received: | 29 April 26 |
| Decision: | 26 May 26 |