Fingal County Council

✔️Decision made
(CC):❓Unknown

An Associated address of Lands at Fieldstown,, Off the R122 Regional Road, Clonmethan Electoral District, County Dublin

In accordance with Section 182A of the Planning and Development Act 2000, Energia Solar Holdings Limited, gives notice of its intention to make an application for a period of 10 years to An Bord Pleanála for approval of proposed electricity transmission infrastructure, cable connection and associated works at Lands off the R122 regional road, within the townlands of Fieldstown, Clonmethan Electoral District, County Dublin, Leinster, Ireland. The Proposed Development comprises of a 110kV Air Insulated Switchgear (AIS) tail-fed substation compound (Substation Site), combined with a 110kV underground cable for connection (Grid Connection) to Finglas Substation consisting of: (i) A 110 kV Air Insulated Switchgear (AIS) tail-fed substation compound, consisting of: • A single storey 110kV AIS substation building (total floor area comprising circa 450m2 , height approximately 6.3m). • Medium voltage (MV) switchgear container and switchboard total floor area comprising circa 60m2 . • 110kV grid transformer and 2no. house transformers within bunded enclosures (approximately 6m high). • Diversion of existing 38kV overhead line (OHL). • 160MV transformer positioned within bunded enclosures (height approximately 6m). • A shunt filter. • Diesel generator & diesel tank. • Twelve lightning protection masts (height approximately 20m). • 2.6m high perimeter palisade fencing and post and rail (1.4m high) fencing. • Internal separation fencing (2.6m high). (ii) Grid Connection consisting of: • A 13.3 km underground 110kV cable connection to Finglas Substation to facilitate connection to national grid. • Approximately 20 no. joint bays primarily within public roadways. • Trenchless installation in the form of horizontal directional drilling (HDD) will be used at the following locations: • Broadmeadow River Bridge before the junction of the R122 and R121. • Ward River Bridge on R122. • Under the N2 prior to entering Finglas Substation. In addition to the above, the Proposed Development will include: • New site entrance off the R122 • Internal access roads and car parking. • Drainage infrastructure. • All associated and ancillary site development works including localised alterations to the landscape. The Planning Application is accompanied by an Environmental Considerations Report (ECR)

Reference: SID/03/23

Received:12 December 23
Decision:29 January 25

Comments

You must be signed in to comment on planning applications

Be the first to provide a comment on this planning application

Sign in to interact with comments or add your own.