We, ORHRE Management Services Limited, intend to apply for permission for development at this site at 19-20 Lombard Street East and 112-113 & 114 Townsend Street, Dublin 2. The development will consist of the partial demolition of existing buildings and structures on site extending to 533sqm (retention of existing façade at 114 Townsend Street) and the construction of a part 5, 6 and 7 storey (over extended basement c. 215 sqm) hostel. Reception, café/bar and resident amenity space at ground floor alongside bin and bike stores, luggage store, kitchen, back of house areas, staff facilities, substation and switch room, with access from Lombard Street East and Townsend Street. A total of 97 no. hostel bedrooms provided on floors 1-6, with setback upper floors. Plant included at basement, first floor podium and roof level, with green roof and 3 no. microwave dishes attached to lift overrun at roof level. Signage zones on northern, southern, eastern and western elevations totalling c. 25 sqm. All associated works to facilitate the development.
Reference: WEB2350/25
| Received: | 4 June 25 |
| Decision: | 25 November 25 |
| ABP Decision: | 20 February 26 |
You must be signed in to comment on planning applications
Be the first to provide a comment on this planning application
Sign in to interact with comments or add your own.