GENERAL INTERNAL WORKS NOT DETAILED IN PLANNING PERMISSIONS : 1) Addressing timber decay 2) Addressing structural issues 3) Refurbishing windows shutter boxes and shutters 4) Evaluating timber floors, retaining where possible and reinforcing structure/ linking levels in other places. Removal of modern timber flooring in kitchen to expose original flooring . Removal of very damaged boards to inner stairway hall G006 , internal lobbies G001 and G002 due to damage incurred by internal partition and other works. It is proposed to lay flooring grade plywood to these to try to unify the floor finishes on this level and finish with a solid/ semi solid oak board to allow for continuous level throughout. 5) Flue investigation and repair; cleaning and replacing of original fireplaces; insertion of simple stoves in order to retain the integrity of the chimney pieces in the rooms 6) Replacement of wall and ceiling linings where necessary. 7) Joinery repair - doors, window linings 8) Service installations to include minimal re-wiring and plumbing 9 ) Re configuration of door into existing ensuite to first floor to allow for better layout and improvement of partition partly blocking existing window. 10 ) Re configuration of permitted timber screens to entrance hall to take into account the structural aspect of the existing concrete beams. 11) Down pipe location (from planning permission) moved from one side of entrance facade to other to tie in with existing drainage flows 12) The provision of new PV panels at roof level 13) Reinstatement of existing gates to existing connectors on entrance piers 14The provision of new gas and ESB pillar (Mandatory requirement for connect
Reference: REF6125
| Received: | 4 April 25 |
| Decision: | 29 April 25 |
You must be signed in to comment on planning applications
Be the first to provide a comment on this planning application
Sign in to interact with comments or add your own.