PROTECTED STRUCTURE : The development will consist of removal of the failing pointing and to fully wig point and repair the brick elevation at first and second floor levels and repair the flush pointing at granite basement level. The side gable is to be fully repaired and flush pointed. Only traditional lime mortars to be used throughout.
Reference: 3730/24
| Received: | 22 May 24 |
| Decision: | 16 July 24 |
You must be signed in to comment on planning applications
Be the first to provide a comment on this planning application
Sign in to interact with comments or add your own.