development will consist of a total floor area of 6,025msq, specifically with the provision of the following, (1) a new 3 storey 5,575msq Manufacturing Building which includes a mezzanine floor and a 4.5m x 0.95m high external sign on the south elevation displaying the applicant's logo. (2) A single 450msq extension to the warehouse of the existing Fill Finish building including a mezzanine level plant room and the addition of a new canopy externally above the loading bay of the existing warehouse. (3) The addition of a new roof top 450mm diameter 4.5m high boiler flue, roof top chiller units and acoustic louvered screens to the existing Central Utilities Building. (4) An extension of the existing car park to provide an additional 70 parking spaces (5) Ancillary bunded tank area, waste storage shed & compound, a utilities compound, a standby generator, 2 no. subterranean surface water attenuation tanks, a fire water attenuation tank and the provision of a new 101m long 9m high pipe bridge linking the existing Central Utilities Building with the new Manufacturing Building and connections to Local authority Foul and surface water drains at Monksland, Co. Roscommon and an Environmental Impact Statement accompanies this application.
Reference: 16280
| Received: | 5 July 16 |
| Decision: | N/A |
You must be signed in to comment on planning applications
Be the first to provide a comment on this planning application
Sign in to interact with comments or add your own.