for the development of the following: 1. Proposed alterations externally at existing main entrance – consisting of the regrading of the existing public footpath to create level access to the banking hall, while preserving the fabric of the existing Protected Structure, 2. Installation of surface water drain at entrance threshold to connect to existing public surface water drainage, 3. All associated site works
Reference: 2460490
| Received: | 11 October 24 |
| Decision: | 3 December 24 |
You must be signed in to comment on planning applications
Be the first to provide a comment on this planning application
Sign in to interact with comments or add your own.