Amendments (2,186sq.m) approx. to previous Planning Ref; SD16A/0250 and amendments (188.2sq.m) approx. to previous Planning Ref: SD13A/0186. Previous Planning Ref’s also include SD15A/0243 and SD15A/0352. The amendments proposed to previous Planning Ref: SD16A/0250 include: relocation of part of the 2.4m high north boundary fence and associated works to landscaping, relocation of proposed feature trees within the site, relocation of proposed pedestrian gate within north boundary fence and re-routing of pedestrian/cycle path (pursuant to Condition 2(e) of SD16A/0250); removal of 2 bicycle shelters, additional louvres, service openings and doors to the production building façade with a cumulative area of (107sq.m) approx; relocation of doors to boiler house; allocation of internal floor slab area (288sq.m) to first floor production building and (10sq.m) to second floor; alterations with a total area (724sq.m) approx. to double height platform, pipe-bridge and single height platform to service yard with approximate overall heights of (11m, 10.5m and 6.4m) respectively; proposed amendments to tank yard with (13.5m) approx. max. tank height; proposed increase in flue heights to (16m) approx. and an additional 3m high fence with gates to service yard. A proposed tank enclosure and hard-standing of (101sq.m) approx. and 3m high fence is proposed to the east side of the Link Corridor with a tank height of 8.5m approx. A refuse storage area 6.5m high with approx. footprint of (427sq.m), 111sq.m of which is fully enclosed and all associated drainage and site-works is proposed to eastern boundary of the service yard. Material alterations of (449sq.m) approx. is proposed to the east façade of link corridor and approx. 80sq.m to south façade of boiler house. Amendments to previous Planning Ref: SD13A/0186 include: increased area of approx. (17sq.m) to set-down area at existing south site entrance and proposed pedestrian route with demarcation to road, new pedestrian gate 2.4m high within south boundary fence and proposed footpath and access gate within existing security hut guarding with combined area of approx. (23sq.m); proposed 3m high panel screening with sliding gates (31sq.m) approx. to existing compactor area and all associated site-works. All proposed amendments are on an 11 hectare site.
Reference: SD17A/0402
| Received: | 9 November 17 |
| Decision: | 11 January 18 |
You must be signed in to comment on planning applications
Be the first to provide a comment on this planning application
Sign in to interact with comments or add your own.