for development consisting of an amendment to the permitted grid connection (Ref. No. PL16/422). The amended grid connection will be from the Black Lough Wind Farm at Tawnamore, Co. Sligo (Ref. No. PL17/93 to the permitted control building at Cloonkeelaun (Ref. No. PL 16/422), traversing the townlands of Tawnamore and Cloonkeelaun. The development will consist of a 20kv cable extending to (a) circa 2.3 kilometres of overhead line supported by a single wooden poles, (b) approximately 240m of underground cabling extending from turbine T2 at Black Lough to the first wooden pole and (c) approximately 100m of underground cabling from the southern-most pole of the proposed overhead line to the control building at Cloonkeelaun. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the planning authority at
Reference: 19160
| Received: | 17 July 19 |
| Decision: | 18 November 19 |
You must be signed in to comment on planning applications
Be the first to provide a comment on this planning application
Sign in to interact with comments or add your own.