(A) change of use of existing buildings from horticultural use to a materials recovery facility. Existing buildings consist of 1no. office type single storey building and 2no. industrial type, single span, metal clad buildings. (B) the construction of a shed type, single span industrial, metal clad building, having a floor area of 434 m², (C) the construction of a single span, metal clad, picking station, having a first floor area of 88m², over the ground floor material storage bays of 160 m² (D) the installation of a covered conveyor, (E) extension of existing yard area and installation of a 2m high, landscaped berm to boundary of entire yard area (F) installation of 2 no. hydrocarbon interceptors, (G) the installation of a proprietary wastewater treatment plant with polishing filter percolation area and (H) upgrade of existing vehicular entrance and all associated site works
Reference: 20896
| Received: | 12 August 20 |
| Decision: | N/A |
You must be signed in to comment on planning applications
Be the first to provide a comment on this planning application
Sign in to interact with comments or add your own.