a) glass storage room (50.5 sq m) temperature controlled, b) electric transformers, c) filtered air intake rooms (168.1 sq m), d) wood maintenance shop (187.2 sq m) e) metal/maintenance shop (240.7 sq m), f) filtered air intake rooms (110.6 sq m), g) yard store room/dry room (4.5 sq m), h) glass storage room (58.6 sq m) temperature controlled, i) glass storage room (103.8 sq m) temperature and vacuum controlled, j) materials storage room (111.8 sq m) temperature controlled, k) offices (72.2 sq m), l) filtered air intake rooms (344.8 sq m), m) glass storage room (55 sq m) temperature controlled, n) glass storage room (55.1 sq m) temperature controlled, o) staff entrance and exit turnstile, p) portacabin (8.3 sq m), q) above ground water storage tank, r) ESB sub station (29.4 sq m), s) water pumphouse (19.7 sq m), t) 40 m long retaining wall and associated buttressing walls, u) concrete marshalling yard areas (4105 sq m) and associated site works
Reference: 21644
| Received: | 10 May 21 |
| Decision: | 15 June 21 |
You must be signed in to comment on planning applications
Be the first to provide a comment on this planning application
Sign in to interact with comments or add your own.