Roscommon County Council

🗑️Incompleted application

Leam Ballybaun Harepark Ardoorooran Carrownageeragh , Grange Beg Knockadoobrusna Ballytrasna , Cashelfinoge and Greatmeadow

permission for development which will consist of the construction of 2 no. wind turbines (maximum turbine tip height 160m) with associated foundations and crane hardstand area and all associated development including 1 No. substation control building, 1 No. permanent meteorological mast (80m height) and associated foundation, hardstand area and ancillary main crane hardstand area, 1,304m of new internal site service roads, underground electric cabling systems between turbines within the wind farm site, 3.75km of overground electric cabling system and 1.53km of underground electric cabling system between the wind farm site and connection point at existing 38 kV ESBN substation in Boyle, 1 No. new site access/entrance off the L-1248 local road at the western boundary to facilitate construction and access, 1 No. temporary construction site compound (750m2, 4 No. peat / spoil deposition areas for storage of excess excavated peat materials, associated surface water management system, tree felling to facilitate site development, temporary works on sections of the public road network along the turbine delivery route (including hedge or tree cutting, relocation of powerlines / poles, lampposts, signage and local road widening) and all associated site works( a Natura Impact Statement and Environmental Impact Assessment Report has been prepared in respect of the application) at

Reference: 21276

Received:26 May 21
Decision:N/A

Comments

You must be signed in to comment on planning applications

Be the first to provide a comment on this planning application

Sign in to interact with comments or add your own.