Permission for development which will consist of an upgrade to the existing Bagenalstown Wastewater Treatment Plant (WwTP) to facilitate an increased treatment capacity. The proposed development will include (1) minor works to the existing inlet works, sludge dewatering building, Picket Fence Thickener, and administration building & control room; (2) change of use to 1 no. clarifier tank to a storm holding tank and minor works to same, as well as minor works to the existing storm holding tank and minor works to same, as well as minor works to the existing storm holding tank; (3) 1 no. aerobic reactor and 4 no. air blowers; (4) 1 no. flow diversion chamber and minor works to an existing flow diversion chamber; (5) 1 no. ferric sulphate storage tank with integrated bund and 2 no. chemical dosing pumps; (6) 1 no. MLSS distribution chamber (7) 1 no. RAS/WAS Pumping Station and 2 No. (each) RAS/WAS Pumping Station and 2 No. (each) RAS/WAS pumps (8) 2 no. final clarifier tanks; (9) 1 no. final effluent chamber (10) treated effluent flow meter & bypass (11) standby generator and (12) all ancillary works including pipework, pumps, landscaping and all associated site development and site excavation works above and below ground. A Natura Impact Statement will be submitted to the Planning Authority with the application.
Reference: 21203
| Received: | 3 June 21 |
| Decision: | 9 November 21 |
You must be signed in to comment on planning applications
Be the first to provide a comment on this planning application
Sign in to interact with comments or add your own.